How to Run an Effective Root Cause Analysis Session
Always investigate safety events
Any release or near-miss
Over 4 hours production loss
3rd time in 6 months
Over €10,000 impact
Could have been serious
Same question, different angles
Push back gently on quick conclusions
Ask for data when possible
Don't dismiss solutions, capture them for later
Equipment condition, design
Procedures, schedules
Parts quality, supplies
Training, workload, skills
Monitoring, gauges
Conditions, context
Pump Failure
Use sticky notes • One idea per note • Brainstorm all causes, then investigate likely ones
"The seal failed" is not a root cause. Keep asking why until you find systemic causes.
"John should have checked" loses the team. Ask: "What system should have ensured it was checked?"
15 root causes = zero root causes. Prioritize the 2-3 that matter most.
"Improve training" isn't actionable. Need: name, specific task, due date.
RCA without follow-up is just a meeting. Schedule 30-day check before leaving.
Confirm what happened, in sequence. Get agreement.
List the 2-3 systemic causes. Get verbal agreement.
Each action: owner + due date. Get commitment.
30-day follow-up in calendars before people leave.
Download free RCA template & facilitator checklist
One-page report format included
The goal isn't a perfect report — it's preventing the problem from happening again